Work continues in school, even when it is 100 degrees outside. The Mularadelis Family is working today painting the Lower Elementary School hallway, and doing a fine job:
Some other areas are taking on color as well, including the new restroom in the Pre 3 Room, the New 2A and New 2B classrooms, and the Conference Room (former GLDC Office). If any school families would like to assist us with the painting, please let me know via email.
Mr. Bonifazi and the Summer Helpers began installing the new floor in the New 2A Room today as well:
The area outside of the doors where the large statue of the Blessed Mother used to be (where the red rocks used to be) is being converted into a new entranceway for our Preschool families. Today, the concrete company dug out the where the forms will be to support the new sidewalk and walls. These forms are ready for inspection, and then to be poured: